The Three Primary Purposes for Expansion Joints
1.

Expansion joints that extend from the building's framing system through the roof assembly facilitate structural movements that are caused from such events as seismic forces; thermal induced expansion and contraction of the roof assembly; and accommodation of minimal planned settlement.

2.

Expansion joints are installed so as to allow for the differential movement of various structural components that result from different coefficients of thermal expansion and contraction. Each building's components have different coefficients of expansion and contraction, and each component is subjected to varying temperature changes, with the result of different thermal induced movements between the roof components.

3. Expansion joints are to alleviate BUR membrane fatigue along continuous locations of discontinuity, and hence to prevent BUR membrane ridging and splitting. Expansion joints are installed to reduce the damage from the stresses and the movements between a building's components; and to prevent those stresses from damaging the roof system.

Roof expansion joints shall be provided at the following locations:
1.

Where an expansion joint is installed in the building's framing system.

2.

Where steel framing or roof decking changes direction.

3. Where separate wings of "L", "U", "T", or similar building configurations are constructed.
4. Where the type of decking changes such as the abutting of precast concrete and steel.
5. Where additions are connected to the building.
6. Where heating or cooling changes significantly, such as a heated office abutting an unheated warehouse.
7. Where movement between vertical walls and the roof deck is planned.

Expansion Joint Criteria to be factored into the Design:
1.

Anticipated thermal movement of the building's components.

2.

The type of roof deck framing support.

3. The roof system component coefficients.
4. Climate conditions to be expected.
   


Where expansion joints are deemed necessary, they shall extend across the entire width of the roof deck; they shall never terminate short of the roof perimeter. Expansion joints shall be designed to accommodate contraction as well as expansion. Expansion joints shall be detailed and constructed to a minimum raised height of 10" above the finished roof system surface.

All expansion joints are required to be raised curb designs. Water shall not drain through or over an expansion joint.

Area Dividers
In the absence of expansion joints in the building's framing system, or where the distance between expansion joints is excessive, area dividers shall be installed to assist the control of thermal stresses in the roof assembly. Area dividers minimize the transmission of stress from one area of the roof assembly to another by dividing the entire roof area into smaller sections. These sections shall be of rectangular shape and uniformly spaced. The designer shall specify the location for area dividers.

The separation of large roof areas provides locations for termination of the roof system, and aids in the control of stress concentrations and fatigue of the BUR membrane. Area dividers can also be installed to facilitate drainage and future reroofing.

Area dividers shall be designed as raised double wood curbs fastened to wood base plates that are attached to the roof deck. Area dividers shall extend a minimum of 8" above the finished roof system surface; shall be located at the high points of the roof assembly, with drainage away from or parallel to the area divider. Area dividers shall not restrict or impede water drainage. Elastic preformed control joints that are designed to be installed in the horizontal plane of the roof are prohibited.

Cants, Curbs, and Nailers
The most vulnerable area of a roof for water entry is where the horizontal roof deck intersects with a vertical penetration. Most water leaks occur at these flashing junctures. Therefore, extra attention shall be given to the design and installation of such flashings.

Cants: The bent radius of the roof and flashing membrane shall not exceed 45 degrees. Cants shall be installed at a angle changes such as those created by roof to wall, roof to curb, or other roof to vertical surface intersections. The installation of cants shall be to lessen the angle of these horizontal to vertical plane changes for the benefit of the BUR membrane.

Curbs: Curbs shall not be installed upon or fastened through roof insulation. All curbs, wood blocking, and penetrations shall be firmly secured to the roof deck before installation of the roof system. Drains, and vent pipes shall be secured prior to installation of the roof system so as to prevent damage to the roof system.

Support Curbs for Rooftop Installed Equipment: The design of the roof deck shall allow for concentrated loads imposed by rooftop installed equipment so as to control deck deflections from damaging the roof system. Vibrations from rooftop installed or joist installed equipment shall be isolated from the roof system. Poorly designed or installed equipment may allow moisture to enter the building either from the exterior or from condensation within the equipment. Therefore, equipment housings must be watertight and insulated. Condensation from rooftop installed equipment is required to be discharged through piping into roof drains, scuppers, or self draining roof perimeters.

Support curbs for equipment mounted on the roof with built-in metal base flashing flanges are prohibited. Only raised curbs that provide for the correct vertical extension of the roof membrane sheets; proper termination of the flashing membrane sheets, and installation of sheet metal counterflashings shall be installed.

Nailers: Well secured, preservative pressure treated, and decay resistant wood blocking and nailers shall be installed at all perimeters and penetrations for fastening the flashing membrane and sheet metal counterflashings. Wood nailers shall be installed on all prefabricated curbs and hatches for mechanical attachment of the flashing membrane.


Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13

 

Fields Company LLC
2240 Taylor Way,
Tacoma WA 98421

Phone:
800-627-4098
Fax:
253-383-2181
email:
sales
customer service

 

 

About Fields | Services | Product Guide | Advertising | BUR Systems

Copyright © 2003 Fields Company, LLC. All rights reserved.